Understanding the Five Parts of a Tag Out Log in Engineering

What are the five parts of the tag out log?

The five parts of a tag out log in engineering are:

- Tag-Out Record
- Tag-Out Authorization
- Tag-Out Period
- Tag-Out Removal
- Tag-Out Verification

In engineering, a tag out log plays a crucial role in ensuring operational safety and maintenance of equipment. Let's take a closer look at each of the five parts:

1. Tag-Out Record

The Tag-Out Record includes important details such as the equipment name, reason for the tag out, and the date and time when the tag out was implemented. This section provides essential information about the status of the equipment and the actions taken for safety purposes.

2. Tag-Out Authorization

The Tag-Out Authorization part of the log indicates who authorized the tag out process. It highlights the accountability in the process and ensures that the necessary permissions were obtained before implementing the tag out.

3. Tag-Out Period

This part of the log specifies the start and end time for the tag-out procedure. Having a clear timeline helps in tracking the duration of the tag out, ensuring that the equipment remains safely out of operation for the necessary period.

4. Tag-Out Removal

Tag-Out Removal section details who removed the tag and when it was removed. This crucial information indicates that the problem has been resolved, and safety measures have been reinstated for the equipment to return to service.

5. Tag-Out Verification

The final part of the tag out log, Tag-Out Verification, shows who verified that the equipment was safe to return to service after the tag was removed. This verification process ensures that all safety checks have been completed before operations resume.

← Garnishment laws what you need to know Why intellectual property is essential for business growth →