Construction Works: Essential Processes in Building Projects

What are some key processes involved in construction works?

1. Formworks for 2nd Flr suspended slab

2. Fabrication and installation of rebar for 2nd floor suspended slab

3. Formworks, shoring and scaffolding for 2nd Flr suspended slab

4. Pouring of concrete (beam and suspended slab)

5. Fabrication of rebar for slab on grade

6. Installation of rebar for slab on grade

7. Pouring of concrete (slab on grade)

8. CHB laying

9. Fabrication of footing rebar

Key Processes in Construction Works

Construction works involve various key processes to ensure the successful completion of building projects. These processes include formwork for the 2nd-floor suspended slab, fabrication and installation of rebar, pouring of concrete, CHB laying, and fabrication of footing rebar.

Explanation

In construction works, various processes are involved to ensure the successful completion of a project. One of these processes is the formwork for the 2nd-floor suspended slab. Formwork refers to the temporary structure used to support the concrete until it hardens. It is designed to provide the desired shape and structure to the slab.

The fabrication and installation of rebar for the 2nd-floor suspended slab is another crucial process. Rebar, also known as reinforcing bar, is used to provide strength and stability to the concrete structure. It is fabricated according to the design specifications and then installed in the formwork.

Formwork, shoring, and scaffolding are essential for the 2nd-floor suspended slab. These elements provide support and safety during the construction process. They ensure that the formwork remains in place and can bear the weight of the concrete and any additional loads.

The pouring of concrete is a critical process in construction works. It involves placing the concrete mixture into the formwork. This process is done for both the beam and suspended slab. The concrete mixture is carefully poured and spread to ensure proper coverage and consolidation.

For the slab on grade, the fabrication and installation of rebar are necessary. The rebar provides reinforcement to the ground-level slab, enhancing its strength and durability. Once the rebar is in place, the pouring of concrete for the slab on grade completes the process.

CHB laying is another process in construction works. CHB stands for concrete hollow blocks, which are commonly used in building walls. The blocks are laid and secured using mortar to create walls that are strong and stable.

Lastly, the fabrication of footing rebar is an important process in construction. Footing rebar refers to the reinforcement used in the foundation footing. It is fabricated and installed to ensure the stability and strength of the foundation.